Network animation, shipped on the engine
Turning a head-office direction into measured action in every branch — targeted campaigns, acknowledged instructions, generated tasks, challenges on verified indicators — on the same engine. This domain runs end to end today.
In the free trial, this domain's screens start empty: the shared demo pre-fills inspections only.
The business problem
Turning a head-office direction into action in every branch takes distribution, tracking and measurement — which email and spreadsheets do not do. When the campaign ends, nobody knows what was actually done, by whom, or what it changed.
What runs today
Shipped and executable end to end on the common engine in v1.5 — every brick below exists in the product, not on a roadmap.
Targeted campaigns
Each campaign has its scope, period and objective.
Acknowledged instructions
Instructions and materials with read receipts; tasks are generated for the branches concerned.
Four measures
Reach, completion, adoption, impact: four distinct measures, never conflated.
Verified challenges
Challenges and rankings computed on verified indicators.
The requirements specification, requirement by requirement
The specification's requirements for this domain — and, facing each, its real status in the product.
| Code | Requirement | Priority | Status |
|---|---|---|---|
| ANI-01 | Create an animation campaign with a target population, calendar and goal. | P2 | Covered |
| ANI-02 | Distribute briefs, materials and tasks to the branches concerned. | P2 | Covered |
| ANI-03 | Track meetings, managerial visits, events and commitments.Engagements available through the API, with no screen; no meetings or events tracking. | P2 | Partial |
| ANI-04 | Manage challenges, rankings and configurable calculation rules.One indicator per challenge. | P3 | Covered |
| ANI-05 | Measure a campaign's distribution, completion, adoption and impact. | P2 | Covered |
Codes and priorities: functional and technical requirements specification, §4.3 and §7.